MV Switchgear Method statement

7,99 

Method statement is a document which describes procedure of preparation, installation and test of the system, define responsibility and a processes before/during/the end works.
The Method statement includes the next content:

• PURPOSE
• SCOPE
• REFERENCES
• DEFINITIONS
• RESPONSIBILITIES
• EQUIPMENT
• PROCEDURE
• RISK MATRIX.

The file is in word format and instantly available after downloading. You only need to change project name, insert logo, and the document shall be ready for consultant/client.