Inspection and test plan for Distribution boards (DB, MDB, SMDB), Motor control center (MCC) and equipment is a document which clients, contractors and subcontractors use to first outline the type of inspections and tests, which will be conducted on electrical works to ensure quality and minimise the chance of issues and defects – and then to sign off on these inspections with actual tests to adhere to the guidelines set out in the plan.
The ITP includes the next installation:

– Main distribution board (MDB);
– Distribution board (DB);
– Sub-Main distribution board (SMDB);
– Motor control centre (MCC);
– Equipment – Capacitor bank.

The document has divided per chronology activities:

1. First part of ITP describes what you need to have of documentation;
2. In the next part is mentioned procedure of delivery and storage materials.
3. This field is intended for installation every segment of this system
4. Test is in this point. Every system has to test after installation and before take-over and commissioning of the project.