Chilled and Heating Piping System Inspection and Test Plan

5,99 

Inspection test plan for chilled and heating piping system is a document which clients, contractors and subcontractors use to first outline the type of inspections and tests, which will be conducted on piping works to ensure quality and minimise the chance of issues and defects – and then to sign off on these inspections with actual tests to adhere to the guidelines set out in the plan.

The ITP includes the next installation:

Steel black pipes and piping system;
Valves, hangers and supports;
Piping insulation;
Identification for HVAC piping and equipment;
Welding.

The document has divided per chronology activities:
1. First part of ITP describes what you need to have of documentation;
2. In the next part is mentioned procedure of delivery and storage materials.
3. This field is intended for installation every segment of this system
4. Test is in this point. Every system has to test after installation and before take-over and commissioning of the project.
The file is in excel format and instantly available after downloading. You only need to change project name, insert logo, and the document shall be ready for consultant/client.